Scout Trooper – Armor – Detonator – Assembly, Completed

Putting It Together…

Final assembly…

With the tube wrapping completed, it’s time to finish building the Detonator…

The tube sits in a small cradle, and is then held in place with a black zip tie.

After it was tight, I cut off the unneeded length of zip tie.

Completed zip tie installation.

The last piece is the back cover.

Back cover installed.

Completed Thermal Detonator.

Leave a Reply

Your email address will not be published. Required fields are marked *